Thermal Insulation for Steam Pipeline Network – Jurong Industrial Estate

Design, supply, and installation of high-temperature thermal insulation for over 5 km of steam pipelines. Work included mineral wool insulation with aluminum cladding, support ring installation, and vapor barrier sealing. All work was executed under live-plant safety protocols with zero downtime.

Outcome:

  • Achieved 20% improvement in energy efficiency.
  • Reduced surface temperature from 220°C to 50°C.
  • Completed project within 4 weeks.

Cold Insulation for Chilled Water System – Marina Commercial Tower

Installation of PUF and Nitrile Rubber cold insulation for chilled water supply and return lines. Work involved anti-condensation wrapping, vapor sealing, and protective aluminum jacketing.

Outcome:

  • No condensation or moisture buildup post-installation.
  • System achieved optimal cooling performance.
  • Work completed in coordination with HVAC teams.

Electrical & Instrumentation Works – Oil Terminal Project

Complete E&I works including cable tray installation, cable pulling, termination, and instrumentation calibration for process control systems. Tasks included loop testing, earthing network setup, and power panel commissioning.

Outcome:

  • Successfully energized all systems without defects.
  • On-time completion with zero non-conformance reports (NCRs).
  • Recognized for exceptional cable management quality.